19 9KW Solar Panel DIY Start To Finish

9kW DIY Home Solar Panel System Installation – Start to Finish

 

Hey, welcome back to projects with everyday Dave, I hope you have a really exciting install. today. I’m here at my friend Dan’s house, and he’s just finished this Morton building. It’s going to be really nice shot. What are you going to do in a Dan,
we’re going to build an off road. Jeep. Yeah, but the kids,
that sounds like a lot of fun, great experiences.

http://sorucevap.netyuvam.com/user/wrenwave9

And Dan wanted to supplement the power for this new building, as well as add some power to his house by putting a solar install on his roof. I’ve done a solar install at my house, and it’s a Ground Array, but there’s no place for a ground array here. So we’re going to put it up on his new building. Fortunately, it’s a steel roof, so we don’t have to worry about shingles deteriorating. Today, we’re going to use que tu systems racking for our roof install, and I want to show you some of the neat things that they have and why I chose to go with that system. Alright, before I get started, I want to go over the racking system that we’re going to use for this, we’re going with k two systems racking. Now the way I came across K two systems was with this mini rail, I was looking for a lightweight solution that I could apply to this corrugated steel roof.

https://hellraiders.cz/forums/users/flamekevin1/

Now this mini rail system is really neat. It’s lightweight, easy to ship. It’s expandable, really flexible solution and can be applied to lots of different surfaces. There’s a seal on the back that seals any penetrations. This screw is self tapping runs right into the steel roof seals with the seal prevents any water from leaking. It’s a really neat solution. The other reason I really liked their system is their clamps are self bonding. They’re really easy to install, they have a flexible plastic clip, you simply push the nut in, give it a quarter turn, and it’s set in place easy to install the panels, you can slide it back and forth, it’ll stay in position.

https://yatirimciyiz.net/user/greeceseeder8

The other thing that’s really neat about these is because they’re self bonding, you don’t need to connect one panel to another using a separate grounding system. These clamps by into the aluminum and create a bonding system through the panels themselves, you only need to ground each string independently. They also have this really neat hidden clamps called the Yeti clamp it slides on and allows you to connect the panel from the inside so you don’t see the end of the panel. Now these clamps are interchangeable and they go with any of their racking systems. Now unfortunately, Dan’s roof has a smooth corrugated top, and this system requires a flat trapezoidal top.

https://outgoingincome.com/forums/users/shrinecolt5/

So we’re going to use their long rail system with these L brackets to attach it to this roof. And in order to use these L brackets, this long rail has a T nut that simply slides in the bracket, we’ll go over that, and we’ll bolt it on. And to hold this to the roof, we’ll be using these Egypt fasteners. These Egypt fasteners have a nice seal, there’s several versions of them. With flat washers for going in the bottom of the corrugation or a curved cup washer, which we’re going to use for our rounded corrugation. I made a mock up here. So I could confirm that there wouldn’t be any water leak issues, these bolts will go into through the corrugation and into the wood purlins which makes a very secure connection. And then we can slide these L brackets on top and bolt them down in place and put our rail system across that.

https://www.coachingandlife.com/forums/users/editorrat6/

The nice thing about these bolts because we’re going into the purlins, we can simply remove an existing screw, make the hole a little bit wider, put them through that screw hole and screw it into the purlin. The washer forms around the corrugation giving us a very nice tight seal and provides a very stable mount for our rail system. So now that you understand the system, why I chose this one, and what we’re going to be applying, let’s go ahead and get it installed on the roof. Fortunately, drew from Ketu systems decided to join us today for this install. And he’s going to give us some tips and tricks on how to most effectively install the racking system. So Drew, how do we start with this? https://forum.umbandaeucurto.com/usuario/pandahyena7
Alright, thanks for having us, Dave. First thing we want to do is get our measurements of the solar panels. So we got our length and our width dimensions from the Jenko 385 watt solar panels were installed today. And we’ll come up top measure the full length of the roof so that we can center this array out east and west and also get a measurement from north to south to get our full length of the roof north south so we can measure so we can measure up and squared out north and south as well. So we’ll have a nice square race and centered on this rooftop and we’ll measure out the total length of what the array is going to be 12 panels long of what our dimensions of our gencos are and then from there start measuring out where mounts are going to lay. So we have we’re going to be staggering our mounts 48 inches on center, which means we’ll have our first row of mounts going straight across at 14 inches and then from there each and every row. We’re going to stagger one Mount 24 inches and then run the full length 48 inches so that we have Are load sitting on different areas of the purlins. http://support.zenoscommander.com/user/swansyrup2
And on this particular roof, the purlins are two feet apart. So we can either have our rails at a two foot pitch or a four foot pitch. And a four foot pitch works really well given us the appropriate cantilever on each side of the panel.

https://www.chaisr.org/forums/users/shrinecurve1/

Now that we have our layout set up, let’s go ahead and get the EGR fasteners put in this roof already has fasteners that hold down the corrugation. So I’m simply going to remove one of those fasteners. Then, I’ll drill out the steel to a diameter large enough for the bolt being careful not to go into the wood and I’ll use a little bit smaller drill for the part that goes into the wood and will drill into the Perlan. I’m going to keep the drill perpendicular to the roof so the rails align with the roof appropriately. Now that I’ve drilled that out, there is a hole in the top of the bolt that allows me to shoot the bolt into the Perlan. Now the roof is held down the corrugation is sealed, and we’re ready to put our L bracket on for Rails.

https://www.evilusions.com/forums/users/pandawave8/

Now you may run into some issues like we did. Whoever installed this roof mostly missed the purlin with their screws in some cases, so we can’t just pull out a screw and put ours in the same location, we have to put ours actually into the Perlan. That’s what structurally holding the solar panels on the roof. So here you can see, we added a little bit larger washer around the screw that had missed the purlin. Then we drilled an additional hole right here where the purlin actually is so that we have a good structural mount for our racking system. So in some cases, we couldn’t just pull the screw out. But here’s the solution we came up with to manage it.

https://mttcoin.com/forums/users/vasesyrup6/

Now that we have our E dot fasteners in the roof, we can set our midplane bolt on the threads where we want to set the entire array. And we’re going to put ours about the middle of the bolt to give some flexibility. Now we’ll set these L brackets. And we start by putting on a washer above the bolt and put on the L bracket, another washer, and then there’s a lock nut. To put on top of that we’re going to put these in just slightly tight so that we’ll have some flexibility in the rotation angle of the bracket when we set the rails. Right to set the first section of rail, we’ve laid the rail out on the roof and our L brackets are a little bit loose so we can pivot them around if we need to slide things. To put this in, we’ll take a tee and just slide it through a slot in the bracket. Turn it 90 degrees, and then Thompson and I can move to the next one.

http://bgexcel.info/?qa=user/chestcrib8

Simply slide the nut through the bracket, slide it into the slot, give it a quarter turn, and then temps at the nut. Alright, now we’re going to put a joining bracket on and this bracket will join however many rails we need to and it slides right over the profile very cleanly. Now the convenient thing about this profile is it has a wide slot in it. So we can just slide the T nut through the hole, turn it 90 degrees, and slide or not on, super easy to connect. And now we’ll take our next section of rail and slide it into the bracket. And in this case, we’ll leave about a eighth inch gap so that for thermal expansion, the rails can expand and contract and then just put the teen out through the hole, turn it 90 degrees and attempts that are not working the way down. Okay, we have secured the top rail and we’ve squared it up with the first section of the bottom rail.

http://cryptomonnaies.me/user/felonyfreeze9

Now to make sure that everything is straight, we’ll run a string line from the top rail to the bottom rail and slide the center rails to match. And that way everything will be in alignment. Now we have a nice straight line to make all of our center rails adjust to which if we hadn’t done the whole rail, we could just easily slide it. So the pro tip here is to set just the first section of rail, not the entire roof so that you can slide it to the string a lot quicker and easier. Okay, the top rail height is set. Now we’re going to set the height of the bottom rail relative to the roof all the way across. And then we’ll use the string to set the center rails to match that height.

https://answerrly.com/?qa=user/notifywave8

So let’s go ahead and loosen that. Okay, right there we go. All right now that we have set the top and bottom rail to height, or we’re going to bring the center rails up to match that we’ll just use a string line to achieve that was a little loop on the end of the string and I’ll set this around the bolt on the bottom rail. Then have someone hold it at the top now we can get our entire array completely flat by matching the two center rails to the outer rails. Alright, now I can bring the rail up to just match the string and then tighten that bolt. Then I can do the same thing with the bottom rail. You Bring it up just to match the string and tighten that bolt.

https://xn--80apgoegfd8d.xn--p1ai/user/flareblow6

Now we’ll work our way down and tighten every bolt so that the center rails match the outer rails that we want to install and pre wire all the optimizers. In order to put them in the right place, we simply measure the width of the panels and then mark that without on the rails with a marker and then place our modules just to the right of that mark so that they’ll all be in the right position when we connect the panels and lay them down. Okay, now that we have our mark rails marked for all the optimizers are going to go we’ll use the optimizer mounting fastener, which is just like all the others simply push it down in the rail and give it a quarter turn and it can slide back and forth to get it positioned exactly where you want it.

http://ask.elb7r.com/user/shrinekevin8

If you can, you can slide this under the bolt. Sometimes it’s easier to remove it as long as you don’t lose the washers, because you need to make sure that this cutting washer is on top of the optimizer. That’s what’s gonna ground the optimizer to the rail system, it cuts through the anodized coating on the optimizer backplate. Now that’s grounded to the rail, and we can put the rest of them on this is the very last optimizer on this string. So one of these will be connected to our extension cable, and the other one will connect to the next optimizer. Okay, I have a spool of 10 gauge solar wire. And I’ll put a link in the description to below to this and all the other things I’m using here.

https://bareeqal5alij.hewaaya.com/user/loaffreeze7

I’ll come off the positive in this case, that’s why I use the red cable. And I’ll connect these two. That’s a secure watertight connection. And the reason I’m doing this now is I want to be able to tuck this extension cable in under the optimizer inside the rail all the way down. That’ll give us nice tight wire management won’t have any issues with wires coming undone or tangled under the roof later. So now that I’ve connected this, we can go ahead and put the next set of modules on. And from there on each module.

https://knowledge.acacia.red/user/vasecrib1

Each optimizer will connect one end to the other, we have two styles of clips here that we’re going to use to manage these cables, one snaps over the rail and the other one goes on the outside of the rail to hold our wires. And the reason we’re going to use both is we want to manage the wires inside the rail in most cases. So we’ll keep these wires up nice and tight to the optimizer and then I can just snap this rail clip right over the rail and that just holds them neatly in place and I can work my way down but where we have an MC four connector, we want to put that outside the rail just in case water or something collects inside the rail, we don’t want that sitting around the joint. So in that case, I’ll use these two clips here to set the wires on the outside of the rail
where the MC four connector is. And then we’ll just come back into the rail after that. https://youth-mooc.eu/forums/users/dewpurple1/
Now that we have that safely outside the rail, we can go ahead and run our extension cable the rest of the way down the rail and put the rest of our optimizers in. Okay, we’ve got a couple of optimizers in I just want to show how we’re connecting all these we’ll take the negative from this optimizer and connect it to the positive of the previous previous one. So I’ll do one loop of that wire under the module and then the opposing connector will head down the rail the other way so it has one loop going under it. That way all of these wires will be completely captured under the panels and we don’t have anything touching the roof. So now that I have those wound up the way I want them, I’ll tuck them into the channel. I can twist my optimizer connector into the rail, set the optimizer over it, make sure that I have all my washers stacked up and now I can connect the two optimizers to each other the tight watertight connection which we will mount outside the rail. Okay, we have all the rails down and all the optimizers attached to the rails so we’re ready to put modules on.

https://glimmerconnect.com/forums/users/frostfreeze8/

We have wire management clips, holding the wires in the rails and then where we have a connector. We move the connector outside the rail just to make sure that it’s never sitting in water. And then we have the rail clips to hold those on the outside. And then we coil the wires up under the optimizer and use the fastener to hold them all in the rail. The goal is to make sure nothing is sitting on the roof here you can see everything is tucked up neatly. There is nothing anywhere near the roof, so we don’t have to worry about anything snagging those wires or causing any problems. At the end we have our extension cable ready to go down to our connector box. There will be one connector left from the end optimizer and the extension cable bringing from the other end of the string, two strings, two sets of wires. To minimize cost on this project. Dan purchased clearance jinko panels from San Tan solar.

https://hatadeposu.com/soru-cevap/user/errorrat2

You can also purchase the Ketu racking we’re using through them. You’ll find a link in the description below. Okay, we’re going to prep the panels before we take them up on the roof so that we’ll be able to just walk them up, set them in place and connect the wires In order to do that, we need to do a little bit of wire management on the back of the panel. Because these are going to be up on the roof we want to make sure that the wires never sag. So I have a couple of wire management clips that we will use to slide on the edge of the solar panel. So first off to remove the zip ties holding the wires together. I’m going to place the clip so the wires will be managed up under the panel.

https://ala3raf.net/user/notifyhockey1

These clips can manage two wires want to make sure that there’s a smooth arc, so we don’t bend the wire too tightly. And then I’ll put one more on the side. So now our panel is ready to be connected to the optimizer and we won’t have to do anything up on the roof other than connect the wires and set the panel down. Thankfully, I have drew here to show us the professional way to carry panels up to the roof. He grabs the panel just below the center line and rests it about the centerline on his elbow and then over his shoulder and his head to carry it up the ladder you need to have a harness and if you don’t have one, you can get one from a big box store or Amazon for less than 100 bucks have someone clipped the harness in at the top and then you can securely carry the panel to its location. If I lost you at harness up and carry solar panels over your shoulder up a ladder, and today’s sponsor energy Powell may be the right solution for you.

https://www.asklent.com/user/swanfloor8

If you want to lower your utility bills with a home solar system like mine or dance, but you’re not ready for DIY thing, click this pop up banner or click on the link in the description below and go to energy Powell for a free custom homes solar quote, you just fill in the form and their advisors will help you pick the right system that makes sense for you and your home. It’s super easy and completely free. I’ve personally talked to the owners of energy Powell and their customers before choosing to recommend them to you. Nine out of 10 homeowners who goes solar through energy Powell say they got the best price and equipment through them.

https://www.linkedin.com/feed/update/urn:li:share:6997880578519773184/

For a limited time using my link will get you an additional $500 rebate once your systems installed. So use the link in the description below. Go to energy PAL and see if solar is right for you in your home. Now for the rest of us di wires back to work. Since we staged the wires down below, it’s very easy to just click the positive and negative MC four connectors to the optimizers. And then we can rotate the panel down and bolt it in place. After we get about three panels in place. We’ll make sure we’re running straight. Before we continue on, we want to set the mid clamps so that the spacer is below the panel but it’s loose enough that the next one will easily slide under the slide easily in the channel. So we can just do the quarter turn set of men and slide them up. Okay, we’ve put most of the first row in, we’ve left one panel out on the end so that we can do our wire management off the end of the roof, we made some very slight adjustments to make sure that the row was running straight across the roof. Now that the bottom row is in except for one panel, we’ll go ahead and do the same for the top row
that I drew here with K through pro tip. So we got the first row of panels already set squared those off made some minor adjustments to get it nice and square with the roof. Now we’re starting to set the second row of modules.

https://vk.com/id729254551?w=wall729254551_258

And the way to do that is you can bump it up right against the panels or I like to add a little air gap. And to do that we have, we could just use the same L brackets that we used on the job mounts to mount the racking to the roof. So just throw a couple of these down. And this will end up giving it nice quarter inch gap between the module rows for little airflow and a little thermal expansion and contraction. nice and square. Now we’re ready to hit her and clamps.
We’re not recommending you put your kids on the roof. But just like me, Dan likes to get his kids involved to learn the process. There you go. Let’s put one more clip in here just to make sure we don’t have any issues. So pop those two wires in the back of that clip.

https://justpaste.it/arar5

Okay, now you can rotate the panel down. It was a lot of fun to have them install a panel and see their sense of accomplishment and having a real part in building the solar system with the rest of us. Okay, make sure it’s pushed up. Yep, it is. It is there it is down there. Okay, thanks. Go down there. You can one foot up. There you go. I’m sure they’ll never forget putting that panel in and who knows what they’ll build when they grow up or you go. Okay, hand it off. Just a little bit more. There you go. All right, you did it. Okay, we’re going to put our junction box together. And I’m going to lay out exactly what we’re doing here on the table.

https://gab.com/ElenaMacy/posts/109341889091230697

We’ll build the box here and then we’ll take it up to the array and put it in place. So we have a two inch two All to make sure it fits underneath our solar panels, five by five box and within it we’ll use a DIN rail connector that will mount to the bottom with a couple of screws. We don’t have to worry about things being perfectly sealed, we’re going to put a small hole in the bottom corner to let any condensation that does get in there drain out. Then we have an inch PVC conduit that’s going to come in the bottom and that’s where our thh n 10 gauge wires will come up there’ll be four of these wires coming into the box. And then we will use these sealed connectors. In order to bring the PV Wire in. We have an MC four connector that connects to the optimizers and then the other end will be bare in order to connect this to the solar to the racking system.

https://qr.ae/pvjFx0

Here’s a chunk of the rail that’s already up on the roof. We’re going to use tea nuts and slide them in into the rail. We’ll put two T nuts in the rail and we’re going to drill holes in the side of the box. And that will allow us to mount this box rigidly to the rail. So let’s go ahead and drill all those holes get everything mounted and then we’ll put it up on the roof and has this nice set of step drills that allows us to move right up on the size hole that we need. It’s really convenient. Give us a little weep hole in case any moisture gets in. We mounted the DIN rail with a couple of self tapping stainless steel screws can simply snap in whatever number of DIN rail connectors you need and in whatever order you want.

Then we’ll just add our one inch threaded adapter for the conduit connection. Okay, we’ve installed all of the panels except for the final two. That way we can do our junction box and wire management and then drop the final two panels in so let’s set the junction box so it’s going to put it right here that runs us just inside the soffit that seemed good. Dan did not want to make any penetrations in the roof so we’re going to run the conduit over the edge of the roof and then back to the building. Okay, now we have our box firmly secured to the rail. Okay, now we have our extension cables run down we’re running them through the grommet and to our junction block these glands tightened to seal so we can just slide our wires through them. And then later when we’re ready to tighten them down. After we have everything adjusted a little bend in the wire, slide it into the terminal and then we can tighten it down. If you’ve watched my other video on these terminal blocks, these are very, very secure. There we go.

And then these are rigid, they will not come out and we can tighten our glands makes a nice watertight seal and also holds them to position. So now those are secured and we’re ready to put in our other extension cables. And then I added a little bit of a relief coil here that we’ll secure to the rail in case anything ever changes later. We won’t run out of length of wire. Okay, we’ll make up an MC four connector up here to do our final extension over to our junction box drip a small portion of insulation that’s going to go up inside the crimp pin, disassemble the extra the seals facing up with the nut in the seal on the wire first and here’s the Pro Tip Set your connector into the tool first, then you can just slide the wire in and it holds it all in place for you crimp it down. Make sure it’s secure, snap it inside the head. Make sure that’s tight, put the seal in place and then thread the nut overtop.

You can get these simple tools that they come with that allow you to quickly disconnect them and they also act as a wrench to tighten them down. It really helps get a little bit more force on it. There it is nice and tight. Now we can connect our screen nice tight watertight connection ready to go to the junction box. I’ve run the positive and negative leaves off the top string and tuck them up underneath the second to last panel and secured them they’re secured up under the panel all the way down. Then they meet up with the positive and negative lead coming off a string to now in all four wires are tucked up under that final panel and then I put a little relief coil in here in case something wants needs to change later. We have the material to do that but it’s all secured so it’ll be up off of the roof and then it comes in through our glands into our DIN rail connector.

And then we just have to do our thh N cable through a conduit that we haven’t run yet. So we’ll put a cap on that and get our conduit run nice and clean. No wires hanging down anywhere. The inverter has a massive heatsink on the back and that’s what allows it to run basically silently. The distributes all the heat from all the components on the inside. Because of that we have to make sure we have eight inches of clearance on the top and bottom and four inches of clearance to the right and left of the unit in the location we install it. We’re going to use a piece of cement board behind the inverter just for extra fire protection. You can hang the mounting bracket on the wall, put a center screw and then we’ll get it leveled up and hanging over. Simple as that. I was way easier than when I was going to try and do solar inverters lightweight and easy to mount It has predefined locations for conductor penetrations, you can use conduit and thh n or in our case, just a wire clamp, be sure to know the codes for your area. Okay, our inverter requires a 40 amp breaker, and you want to put that at the bottom of the panel.

Now in this case, the panel was fed from the bottom, so we’ll put it at the opposite end, which will be the top of this panel. So I’m gonna go ahead and turn the power off to this unit and then install the breaker at the opposite end. Alright, cut off, cut off a piece of six gauge wire. Now, we could use eight gauge for this, but I decided to go with six gauge so that we would reduce the heat and losses. There’s 120% rule for adding a backfeed breaker. If you have a 200 amp load center, you can have a max of 240 amps feeding it generally a 200 amp breaker for the line input and a 40 amp breaker for the solar input. With this type of junction block, it’s very critical that you strip the specified length of insulation and make sure the conductor is completely seated into the connector. Insert your screwdriver into the release hole and make sure that the conductor is completely inserted into the unit before you remove the screwdriver.

Give the wire a good tug and make sure it’s secure. If not, you can have a high resistance connection that could result in a fire around our neutral to the neutral bus and then our line one and line two to the two legs of the input breaker which we’re leaving in the off position for now, because we’re not ready to power up or a unit. But now the breaker panel is wired we can put the cover on and put our stickers on. With the junction box installed and the inverter mounted we simply need to connect the two with our one inch conduit. Three quarter would be sufficient for this run but one inch gives more flexibility. We’re running over the edge of the roof so we added an L bracket to the edge of the roof to support the conduit. Then with a combination of 90 and 45 degree elbows we worked our way over the soffit back to the side of the building and down to the ground.

Keep in mind National Electric Code limits you to 490 degree bends between pole points. We used a couple of 40 fives to smoothly come back to the wall from the inverter and then 190 degree takes us right out of the building. The ground run along the outside of the building was the longest stretch so it was easiest to pull that length first, then feed up to the roof and into the inverter using a fish tape. As usual, I made a loop in the conductor to make sure there’s a little bit of room for flexibility. We don’t want to run straight out of the conduit and right into the lugs. Perfect everything’s wired up. The nice thing about the solar edge optimizers is they hold the voltage from each panel to one volt during setup. So there’s no more than 12 volts available on each one of these lines right now. Now we just have to cap it off, and we’re good to go. Okay, we have the final connections made. I’ve installed the ground wire and it connects to one rail from the top string and one rail from the bottom string. And since all of the clamps along the panels are self bonding, we don’t need anything else except to connect the ends of the two rails and then that groundwater goes down to our stake in the ground. Finally, we added the DC junction box warning label and the wiring on the roof is finished.

Do not run directly out of the conduit into the junction block give yourself several inches of conductor to work with. When making the final connections on this type of inverter. It’s very critical to make sure you strip sufficient length of wire, insert your screwdriver into the release hole and make sure that the conductor is completely inserted into the unit before you remove the screwdriver. Give the wire a good tug and make sure it’s secure. If not, you can have a high resistance connection that could result in a fire. Now I can test the connections, make sure it’s all working properly. And then we’ll put the final two panels on. It’s a nice feeling to put the last two panels in and finally be off the roof. I know I should have a harness on I’m sure I’m gonna get plenty of comments about that. We’re going to use hidden Yeti clamps to secure these last two panels in.

The nice thing about that is you can’t see the clamp on the end and you can put a nice finish cap on and it really cleans up the end of the panels. In fact, you can cut the rails off flush with the panels if you want to. I left a couple inches extended here, just in case in the future we use different panels that are different which will have enough rail to install them. All right, all the panels are in ready to turn it on. And now we’re going to put labels on and it’s important to put all of the appropriate markings on the inverter, the cables the conduit, and so you can get this pack of labels and it will have everything you could possibly need. So we’ll just sort through that find the labels we need and stick them on. We already placed the warning label on the DC jack Which unbox on the roof and the photovoltaic power source label in a few places along the conduit.

Alright, we’re going to place a few of the stickers on the inverter, we need to put DC disconnect under the DC disconnect, this is the main DC disconnect for the whole system. And then it’s very important that we don’t disconnect this under load, you have to let the systems shut down slowly to bring the load down before you just turn this off. So there’s a warning for that. And then if someone takes this cover off, we want them to be aware that these DC lines will be energized. And then this sticker will allow us to indicate the actual voltages and current that the system is set for. And then we wouldn’t want anyone cutting into these lines not being aware that they could be hitting high voltage DC. So we’ll put a warning label here and a few other places along the conduit. So everyone knows exactly what the purpose is. For the breaker itself, we put in a sticker for not relocating this device, we want it to be at the opposing end of the input power so that the bus bar is balanced, and then a sticker that warns everyone that this is a photovoltaic power source.

And then on the panel itself, we put a sticker to show that there is a back fed breaker in here, just so that if anyone opens it, they’re aware of that from the beginning. This is the main panel for the house. And we want to make sure that if anyone opens it that they’re aware that there is a dual source for that. So we’ll put a warning sticker on that panel. And then this is the AC disconnect, this will allow the utility to disconnect the photovoltaic power, which is coming from the shop. So this actually disconnects the entire shop and full of a take system from the utility connection. So if the utility ever needs to work on this, they can shut this off, and not have to worry about the solar panels energizing this panel. And we’re ready for our inspection. All right, now that we’ve run both the AC and the DC lines, we can use the Setup app for this particular inverter to get it commissioned.

Now every inverter is going to be a little bit different. So I won’t go through all those details. But we’ll turn on the AC breaker and the power for our inverter. And then I’ll just use the app for solar edge to go ahead and commission it and then we’ll be able to see online what it’s producing. It’s now going through a process of updating the firmware on all the firmware has been uploaded. And now because this is a system with optimizers, we need to connect each one of the optimizers in a process in a pairing process. So the app has his turn on the DC. So that’s the switch we’ll go ahead and turn on the DC there has to be some light outside for the panels to actually be putting out some power.

And now I can start the pairing process. Now the optimizers are talking to the inverter across the DC lines using a high frequency communication. And it will work its way through every optimizer identifying it. And then it will send that information through the internet to our app. So we can track each panel individually. All right, pairing is successful. Okay, it took a couple minutes to monitor the grid and make sure that it matches the sine wave and there’s no issues there. All the parents complete and the inverter just clicked on. And we’re producing 857 watts right now. We’ll be able to pull up the monitoring app and see how each panel is performing. It’s at 415 volts DC, and we’re up and operational.

All right, Dan, we got all the panels in wasn’t super easy getting those panels up here, but looks great. It’s all installed. Why do you think it’s amazing, better than I could have imagined. So I’m excited to see what kind of power it produces and the money I can save.
Let’s get it powered up and see what we can make it stay awesome. If you have space, I always recommend installing a Ground Array. You can watch the step by step installation of my nine kilowatt Ground Array right here. If you’re looking for a smaller scale project, follow along with my three kilowatt shed array right here. You can find links to products used in this install and lots of helpful information in the description below. Lots of great projects coming up. I’ll see you next time.

Or simply visit this Top List for Solar Tiles 2023

Our Previous & Other Posts in these series:

  1. https://vanilla.energy/news/2022/12/13/9kw-diy-home-solar-panel-system-installation-start-to-finish/
  2. https://vanilla.energy/news/2022/12/13/how-much-can-solar-panels-save-you-in-the-uk/
  3. https://vanilla.energy/news/2022/12/13/what-if-all-houses-were-covered-with-solar-panels/
  4. https://vanilla.energy/news/2022/12/13/best-solar-generator-for-2023-the-ultimate-guide/
  5. https://vanilla.energy/news/2022/12/13/solar-panels-plus-farming-agrivoltaics-explained/
  6. https://vanilla.energy/news/2022/12/13/what-tesla-solar-wont-tell-you-unless-you-ask/
  7. https://vanilla.energy/news/2022/12/12/bifacial-solar-panels-the-best-solar-panel-real-world-results/
  8. https://vanilla.energy/news/2022/12/12/how-green-is-solar-energy-really/
  9. https://vanilla.energy/news/2022/12/11/insane-rooftop-wind-turbine-halves-solar-panel-costs/
  10. https://vanilla.energy/news/2022/12/08/the-truth-about-solar-panels/

Posted

in

by

Tags:

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *